| - M - |
|
| MAWB |
Master Air Waybill |
| MB |
Megabyte |
| MBO |
Management By Objective |
| Mbps |
Millions of bits per second |
| MIS |
Management Information System |
| MLB |
MainlandBridge |
| MLO |
Main Line Operators |
| MMS |
Multimedia Messaging Services |
| MPEG |
Motion Picture Experts Group |
| MQC |
Minimum Quantity Commitment |
| MRP |
Material Requirements Planning |
| M/S |
Motor Ship |
| MSDS |
Material Safety Data Sheet |
| MTO |
Multimode Transport Operator |
| - N - |
|
| N/A |
Not Applicable/Not Available |
| NAP |
Network Access Point |
| N.O.E. |
Not Otherwise Enumerated |
| N.O.S. |
Not Otherwise Specified |
| NVOCC |
Non Vessel Operating Common Carrier |
| - O - |
|
| OCP |
Overland Common Point |
| QDII |
Qualified Domestic InstitutionalInvestors |
| OEM |
Original Equipment Manufacturer |
| QFII |
Qualified Foreign Institutional Investors |
| O/H |
Over Height |
| OPM |
Other People's Money |
| ORC |
Origin Receiving Charge |
| O/S |
Open Side Container |
| O/T |
Open Top Container |
| O/W |
Over Width |
| - P - |
|
| P2P |
Path to Profit |
| PCD |
Pitch Circle Diameter |
| PCS |
Port Congestion Surcharge |
| PDA |
Personal Digital Assistant |
| PDF |
Portable Document Format |
| PENAVICO |
China Ocean Shipping Company |
| P&I Club |
Protection and Indemnity Club |
| PKI |
Public Key Infrastructure |
| POD |
Port ofDischarge |
| POL |
Port ofLoading |
| POP |
Point of Presence |
| PP |
Pre Paid |
| PPP |
Point-to-Point Protocol |
| PSS |
Peak Season Surcharge |
| PSTN |
Public Switched Telephone Network |
| PTO |
Please Turn Overleaf |
| PWS |
Personal Web Server |
| - R - |
|
| RAM |
Random Access Memory |
| RF |
Reefer Container |
| RFP |
Request For proposal |
| RFQ |
Request For Quotation |
| RFRC |
Rail Fuel Recovery Charge |
| RMB |
Renminbi |
| Ro-Ro ship |
Roll-on Roll-off ship |
| ROA |
Return On Assets |
| ROI |
Return On Investment |
| R/T |
Revenue Tons |